Testing & Commissioning

What We Deliver

  • Thorough pre-energisation testing, relay calibrations, and high-voltage insulation audits.
  • Protection coordination checks, circuit breaker timing tests, and earth resistance validation.
  • Grid energisation supervision, statutory documentation preparation, and compliance sign-offs.

Project Scope & Capabilities

  • EHV, HV, MV, and LV electrical installations testing and reporting.
  • Numerical protection relay programming, primary injection testing, and secondary injection checks.
  • Transformer dielectric oil testing, ratio checks, and winding resistance verification.

Typical Project Environments

  • Utility substations and high-voltage grid switchyards.
  • Industrial manufacturing complexes, commercial buildings, and institutional campuses.
  • Pre-handover audits for completed turnkey electrical installations.

Lifecycle Integration

  • Pre-Commissioning: Step-by-step checklist execution and fault isolation before energisation.
  • Commissioning: Phasing alignment, load trials, and utility handover.
  • Periodic Testing: Annual relay recalibration and insulation resistance re-certification.

Technical Parameters Matrix

High-Voltage Tests
Insulation resistance (Megger), cable sheath checks, and Hipot testing.
Switchgear Tests
VCB contact resistance (micro-ohm), breaker timing, and interlocking checks.
Earthing Tests
Earth pit resistance measurements and structural grid continuity mapping.

Discuss your electrical project requirements with our engineering team.